← Services

Tank-to-Vessel Loading

Loading of stored product onto seagoing vessels or barges at the terminal jetty, under independent inspection.

How it works

  1. 1Vessel nomination, berth slot and loading instructions agreed
  2. 2Ship/shore safety checklist completed before hoses connect
  3. 3Pre-loading tank gauges, samples and vessel tank inspection
  4. 4Bill of lading figures based on shore and vessel measurements

Technical notes

  • • Vessel Experience Factor (VEF) applied when comparing ship and shore figures
  • • Loading rates agreed with terminal and vessel master